Skip header and jump directly to primary site navigation.

Clark Pacific: Kilroy Oyster Point Parking Structure 2 - 10-level, 665,055 SF structure with 1,961 stalls for Kilroy Oyster Point Phase 2. Built into a hillside with multi-level entries, a grey-blue screened exterior, and a Hybrid Moment Frame for seismic resilience.
Contact #1:
Doug Bevier
Director of Development
710 Riverpoint Court, Suite 100
West Sacramento, CA 95605
Phone: (916) 471-1421
Fax: (916) 372-0323
Email: dbevier@clarkpacific.com
Contact #2:
Lauren Ireland
Business Development Manager
2855 E. Guasti Road, Suite 401
Ontario, CA 91761
Phone: (909) 232-8587
Email: lireland@clarkpacific.com
For decades, Clark Pacific has been a leading manufacturer of prefabricated building systems, bridging the gap between manufacturing and construction to deliver high-quality and cost-effective solutions. Our systems approach focuses on advancing better buildings by giving control to owners, contractors, and architects. We balance design flexibility with integrated systems to achieve budget certainty, faster schedules and reduce risk for commercial and institutional projects. Our team is dedicated to engineering, manufacturing, and constructing each building with care and precision, becoming a valuable part of the community. We are committed to creating sustainable, energy-efficient buildings that will stand the test of time, and are designed to meet the specific needs of each client.